Mob:0086 15355919299

OC12 Paper Cup Machine for coffee tea paper cup | Servo -Pappbechermaschine

OC12 Paper Cup Machine for coffee tea paper cup

ZBJ-OC12 Paper Cup Machine Video

All videos: https://www.youtube.com/user/TheCupmachine/playlists
Video in youtube: ZBJ-OC12 Medium Speed Paper Cup Mkaing Machine Video

Mob/Whatsapp/WeChat: +86 153 55919299
E-Mail: feenot8@gmail.com

ZBJ-OC12 Paper Cup Machine Brief info

# Geschwindigkeit: 70~80 pcs/minute,
# Cup Size: 2~16 oz
# Material: 150~350 gsm 1PE & 2Auf Papier
# SPS -Kontrolle, Open Cam + Shaft + Gear drive,
# Servo motor feed bottom,no bottom wastage.
# 11 sensors detect & fault alarm & stop,no wastage,
# Cup side welding: by Ultrasonic,
# Cup bottom heating: by Air compressor Hot-Air,
# Remote controller,
# Quality electric parts(famous brand), Auto oil system
# Arbeitskraft: around 3.5KW
# Stromquelle: 380V 3-Phasen 50/60 Hz
# Brauche Luft (Druck:0.3~ 0,5 MPa, Ausgabe:0.5 CBM/m)

ZBJ-OC12 Medium Speed Paper Cup Making Machine Picture

OC12 paper cup machine for coffee tea paper cups

OC12 paper cup machine for coffee tea paper cups

ZBJ-OC12 Paper Cup Machine Technician

Modell ZBJ-OC12 ZBJ-OC22
Cup Size range: 3 ~ 16 oz 8~ 22oz
T: 45~90 mm

B: 35~72 mm

H: 40~135 mm

T: 45~90 mm

B: 35~72 mm

H: 40~170 mm

Geschwindigkeit: 70 ~ 80 PCS/minute 50~60 pcs/m
Raw Material: One-side or Two side PE/PLA/PBS coated paper
Suitable paper weight: 160~ 350 GSM 220~ 350 GSM
Gesamtleistung: 9KW 15KW 15KW
Working Power: 3.5 KW 13.5KW Ceramic Hot Air 13.5KW Ceramic Hot Air
Gesamtgewicht: GW/NW: 2600/2500Kg 2700/2600Kg
Packgröße (L*w*h) 2.25×1.23*1.95 (2.4 X 1.4 X 2.1 pack size) 2.25 * 1.34 * 1.95m
Cup Side Welding: Ultraschall
Cup Bottom Heating: Compressor Hot Air ( Ceramic Hot Air , extra cost)
Cup Bottom Knurling: Heater Knurling (for single PE coated paper)
Cool Device (circle water), for double PE coated paper
Stromquelle: 50Hz, (380V 3-phase, 50Hz), * if User power different? Please INFO US IN ADVANCE.
Working Air Source: Air pressure:0.4MPA; Air Out-put:0.6m³/minute (User should BUY Air Compressor)
Wir behalten uns das Recht vor, die Spezifikationen ohne vorherige Ankündigung zu ändern.

ZBJ-OC12 Paper Cup Machine Other info

  • Speed 70~80 cup/minute
  • HMI & PLCProgram computer control, Einfacher Betrieb,
  • 11 sensorsdetect all steps, any fault auto stop, one cup fan cut one bottom disc, no wastage.
  • Servomotor control the bottom feed, precision and reliable, no wastage,
  • Open Cam(8-divide) drive, compare with index gear box, Einfache Wartung, stabil und zuverlässig, easy replace broken parts.
  • Remotecontroller, easy control and adjustment,
  • Quality Shaft & gears drive the movement, more stable than chain system,
  • Only ONE main turntable, more efficient and reliable.
  • Self lubricate(automatic oil lubricate),
  • Quality bearing and electronic element, long life,
  • Robot straight lift the cup body to main mold.
  • Bottom disk straight punched and send to the cup body, less wastage and precision.
  • Separately cam control the bottom movement, machine smooth and light,
  • Advanced bottom knurling system, reliable and long life,
  • Cup side sealing ultrasonic (1Pe & 2Auf Papier),
  • Bottom hot air heating , good sealing,
  • Working power less, Kosten sparen,
  • With cup collector/stacker, One worker run 2~3 sets cup machine, save labour,
  • Optimize the movement design, frame, parts, machine more light pressure, Lange Leben.

ZBJ-OC12 Medium Speed Paper Cup Making Machine

After Sales Service:
1 Garantie: Wir bieten a 12 Monate Garantie. Während der Garantiezeit, Wir bieten einen kostenlosen Austausch von beschädigten Teilen aufgrund von Qualitätsproblemen (Postgebühren vom Käufer abgedeckt).

All failures/broken caused by improper operation of the buyer and/or normal abrasion are not within the warranty.

2 Spare Parts: Each machine has its standard spare parts.
3 Handbuch, Video, Um die Maschine zu bedienen, Fragen Antwort innerhalb 48 Std. (außer Urlaub).
4 FREI: Der Käufer lernen, wie man Maschine betreibt, wie man sich anpasst, wie man Teile wechselt. It is free.

(Der Käufer sollte seine Ticketkosten bezahlen, Hotel, Essen, usw).

5 Der Verkäufer verpflichtet sich, Techniker zur Installation zu versenden & Ausbildung, die vom Käufer gedeckten Kosten.

Technician cost includes: round tickets, accommodation (Hotel, Essen), an allowance of USD100 a day.

6 Mechanic overseas Cost include:

1, Mechaniker, (Zum Beispiel ein Maschinentraining 5 Tage, auf dem Weg 2 Tage, insgesamt 7 Tage, $100*7=$700)

2, Ticketkosten, Runde Ticketkosten (ein anderes Land die Kosten anders),

3, Visumkosten, Einige Land müssen Visumkosten benötigen,

20 Feet container load 4sets OC12,

40 Feet container load 8sets OC12

Vorläufig:

Nächste:

Hinterlasse eine Antwort

61 + = 67
Angetrieben von Mathcaptcha

Eine Nachricht hinterlassen