ZBJ-OC12 Medium Speed Paper Cup Making Machine Video
Video in youtube: ZBJ-OC12 Medium Speed Paper Cup Mkaing Machine Video
Mob/Whatsapp/WeChat: +86 153 55919299
Email: feenot8@gmail.com
ZBJ-OC12 Medium Speed Paper Cup Making Machine Brief
# Speed: 70~90 pcs/minute,
# Cup Size: 2~16 oz
# Material: 150~350 gsm 1PE & 2PE paper
# PLC control, Open Cam + Shaft + Gear drive,
# Servo motor feed bottom,no bottom wastage.
# 11 sensors detect & fault alarm & stop,no wastage,
# Cup side welding: by Ultrasonic,
# Cup bottom heating: by Air compressor Hot-Air,
# Remote controller,
# Quality electric parts(famous brand), Auto oil system
# Working power: around 3.5KW
# Power Source: 380V 3-Phase 50/60 Hz
# Need Air (pressure:0.3~0.5Mpa, Output:0.5 CBM/m)
ZBJ-OC12 Medium Speed Paper Cup Making Machine Picture
ZBJ-OC12 Medium Speed Paper Cup Making Machine Technician
Model | ZBJ-OC12 Heater | ZBJ-OC12 Ultrasonic | ZBJ-OC22 Ultrasonic | ||
Paper Cup Size: | 40ml ~ 300ml | 3 ~ 16 oz | 8~22oz | ||
Cup dimensions | Top: 45~90 mm
Bottom: 35~72 mm Height: 40~135 mm |
Height: 40~180 mm
Top: 45~90 mm Bottom: 35~72 mm |
|||
Speed: | 70 ~ 90 PCS/minute (stable 70~80 pcs)
Speed affected by cup size, paper quality & thickness |
50~60 pcs/m | |||
Raw Material: | One side PE | One-side or Two side PE coated paper | 1PE & 2PE | ||
Suitable paper weight: | 140~250gsm | 180~350gsm | |||
Power Source: | 50Hz, (380V 3-phase, 50Hz), (Better use 380V 3-phase)
* if User power different? Please INFO US IN ADVANCE. |
||||
Total Power: | 8KW | 9KW | 15KW | ||
Working Power: | 3.5 KW | 4 KW (compressor hot air) | 13.5KW Ceramic Hot Air(option) | ||
Total Weight: | GW/NW: 2600/2500KG | 2800KG | |||
Pack Size (L*W*H) | 2250 x 1340 x 1950 mm | 2.25 * 1.34 * 1.95m | |||
Working Air Source: | Air pressure:0.4Mpa; Air Out-put:0.6m³/minute (User should BUY Air Compressor) | ||||
Cup Side Welding: | Pre-heating + Heater | Ultrasonic | |||
Cup Bottom Heating: | Heater (40ml~100ml) | Hot Air (heater) Or Ceramic Hot Air(extra option) | |||
Cup Bottom Knurling: | Heater | Heater Knurling (if use single PE coated paper) | |||
Cool Device (circle water), for double PE coated paper | |||||
We Reserve the right to alter specifications without prior notice. |
ZBJ-OC12 Medium Speed Paper Cup Making Machine Other info
- Speed 70~90 cup/minute
- HMI & PLCProgram computer control, easy operate,
- 11 sensorsdetect all steps, any fault auto stop, one cup fan cut one bottom disc, no wastage.
- Servomotor control the bottom feed, precision and reliable, no wastage,
- Open Cam(8-divide) drive, compare with index gear box, easy maintenance, stable and reliable, easy replace broken parts.
- Remotecontroller, easy control and adjustment,
- Quality Shaft & gears drive the movement, more stable than chain system,
- Only ONE main turntable, more efficient and reliable.
- Self lubricate(automatic oil lubricate),
- Quality bearing and electronic element, long life,
- Robot straight lift the cup body to main mold.
- Bottom disk straight punched and send to the cup body, less wastage and precision.
- Separately cam control the bottom movement, machine smooth and light,
- Advanced bottom knurling system, reliable and long life,
- Cup side sealing ultrasonic (1PE & 2PE paper),
- Bottom hot air heating , good sealing,
- Working power less, save cost,
- With cup collector/stacker, One worker run 2~3 sets cup machine, save labour,
- Optimize the movement design, frame, parts, machine more light pressure, long life time.
ZBJ-OC12 Medium Speed Paper Cup Making Machine
Price Item: | FOB Ningbo port, China. | |
PaymentItem: | Option 1, T/T payment (30% deposit, 70% before delivery).Option 2, Irrevocable L/C at sight (By L/C, Extra $1000 bank charge per shipment).
**** The buyer is welcomed to test machine before delivery. |
|
Delivery Time: | 30~60 days at sight the deposit. (actual delivery time given while order confirm) | |
Package: | Standard export package. (need special package, please info us in advance). | |
Electric Power Source: | The electric power source for this machine adopt 380V 3-phase 50Hz.If the buyer’s power source different, should declare in advance. |
1 | We offer a 12 months warranty. During the warranty period, we provide free replacement of damaged parts due to quality problems (post charges covered by buyer). All failures/breaking caused by improper operation of the buyer and/or normal abrasion are not within the warranty. | |
2 | Spare Parts: Each machine has its standard spare parts (see list). | |
3 | Manual, Video, to help operate machine, Questions response within 48 hours (except holiday). | |
4 | The buyer come to learn how to operate machine, how to adjust, how to change parts. It is free.
(buyer should pay for his cost of ticket, hotel, food, etc). |
|
5 | The seller agrees to dispatch technician for installation & training, the cost covered by the buyer.
Technician cost includes: round tickets, accommodation (hotel, food), an allowance of USD100 a day. |